1. <cite id="vwytj"><listing id="vwytj"></listing></cite><strike id="vwytj"></strike>

    1. Pressure test reservation

      新聞資訊

      新聞資訊

      Tonzo ppr quickly install the elevator base is listed in March

      2017-03-30
      Product pictures
       

      At the time of installation, a elevator base is installed at 1 m per interval.

      As shown in the figure below:

      Each hanger can be up to 600N.

      It's about 4.8 N per meter in full water,

      600N>>>>>>4.8N。



      Ensure the quality of the products is stable while ensuring the speed of installation.


      免费看片一级无码福利,亚洲国产原创AV在线播放,亚洲成a人v在线观看,91av在线免费观看

      1. <cite id="vwytj"><listing id="vwytj"></listing></cite><strike id="vwytj"></strike>